Board foot calculator

A board's thickness, width and length and how many in. Board feet, cubic feet and the cost at your price out.

Result

10 boards are 80 board feet.

Each board is 2 × 6 × 8 ÷ 12 = 8 board feet. In all, 6.67 cubic feet of wood.

Add the price per board foot to see what it costs.

The board

Thickness
2"
Width
6"
Length
8' 0"
Each board
8 bd ft
Length
LengthWidthThickness
Thickness and width in inches, length in feet and inches. Fractions such as 5/4 or 1 1/2 work as typed.

How board feet are worked out

A board foot is 144 cubic inches: a board 1 inch thick, 12 inches wide and 1 foot long. Multiply the thickness and width in inches by the length in feet and divide by 12. A 2x6 that's 8 feet long is 2 × 6 × 8 ÷ 12 = 8 board feet.

Board feet = thickness (in) × width (in) × length (ft) ÷ 12Board feet = thickness × width × length, all in inches, ÷ 144Cubic feet = board feet ÷ 12

Board feet in common pieces

PieceBoard feet
1x6, 8 ft4
2x4, 8 ft5.33
2x6, 8 ft8
2x8, 10 ft13.33
2x10, 12 ft20
2x12, 16 ft32
4x4, 8 ft10.67
6x6, 10 ft30

Which size to enter

Enter the size the lumber is priced by. Framing lumber is called by its nominal size, the 2x6 in its name, and hardwood thickness is named in quarters of an inch: 4/4 is 1 inch, 5/4 is 1 1/4 and 8/4 is 2. If the yard quotes a price per board foot, ask which size it figures from.

Common questions

How many board feet in a 2x4x8?

5.33 board feet: 2 × 4 × 8 ÷ 12.

What is a board foot?

144 cubic inches of wood: 1 inch thick, 12 inches wide and 1 foot long.

How many board feet are in a cubic foot?

Twelve. A cubic foot is 1,728 cubic inches, and 1,728 ÷ 144 = 12.

How do I price lumber by the board foot?

Multiply the board feet by the price per board foot. Enter the price above and the calculator does it; for a whole job with labor, overhead and profit, an estimate lists the lumber as its own line.

Walk the job. Send the bid.

The phone measures every room. BluMatrix writes the estimate line by line, with labor and materials at current prices for the ZIP code. 3 days free.

Measure the roof. Send the bid.

The roof from the address, the estimate line by line at current prices for the ZIP code, and the client signs online. 3 days free.

Walk the loss. Send the estimate.

The phone measures every room. BluMatrix writes the estimate line by line at current prices for the ZIP code, with the ESX file for Xactimate. 3 days free.

Scope it on the visit.

Every room measured on the phone, the estimate written line by line at current prices for the ZIP code, and an ESX file that opens in Xactimate. 3 days free.

Know what the job should cost.

Scan the rooms with your phone. BluMatrix writes the estimate line by line, with labor and materials at current prices for the ZIP code. 3 days free.