Concrete calculator

A slab, a footing or round columns in. Cubic yards to order, or the bags of premix to buy, out.

Result

The pour takes 1.36 cubic yards of concrete, or 36.7 cubic feet, with 10% waste.

Before waste it is 1.23 cubic yards, 33.3 cubic feet.

In bags of premix

  • 62 bags of 80 lb, 0.60 cu ft a bag
  • 82 bags of 60 lb, 0.45 cu ft a bag
  • 123 bags of 40 lb, 0.30 cu ft a bag

The pour

Length
10' 0"
Width
10' 0"
Thickness
4"
Pour
Length
Width
LengthWidthThickness
Length and width in feet and inches, thickness in inches. For a column or a post hole, the diameter across the top in inches and the height or depth.

How concrete is worked out

Volume is length times width times thickness, all in feet, so inches are divided by 12 first. A 10 by 10 foot slab 4 inches thick is 10 × 10 × 0.333 = 33.3 cubic feet. Concrete is sold by the cubic yard, 27 cubic feet, so that slab is 1.23 cubic yards.

Slab or footing = length × width × (thickness ÷ 12)Round column = 3.1416 × (diameter ÷ 24)² × height × columnsCubic yards = cubic feet ÷ 27

For a round column or a post hole, the diameter in inches divided by 24 is the radius in feet. A 12 inch tube 4 feet deep holds 3.14 cubic feet.

Add 5 to 10% for waste: ground that dips, forms that bow, and what stays in the mixer and the wheelbarrow. Running short in the middle of a pour leaves a cold joint, so the order errs high.

Bags or a truck

Premixed concrete in bags yields, by Quikrete's published figures, about 0.6 cubic feet for an 80 lb bag, 0.45 for a 60 lb bag and 0.3 for a 40 lb bag. A cubic yard takes 45 bags of 80 lb, 60 bags of 60 lb or 90 bags of 40 lb.

Past a yard or so, a ready-mix truck usually beats mixing bags by hand. The supplier's minimum order and its charge for short loads decide where that line falls; a call with the cubic yards from this page gets the price.

How thick to pour

  • Sidewalks and patios: 4 inches.
  • Driveways: 4 inches for cars, 5 to 6 inches where heavier trucks park.
  • Footings: at least 6 inches thick (IRC R403.1.1), as wide as the soil and the load require, with the bottom below the local frost depth (IRC R403.1.4).

Common questions

How many bags of concrete make a yard?

45 bags of 80 lb, 60 bags of 60 lb or 90 bags of 40 lb, at Quikrete's yields.

How much concrete does a 10 by 10 slab take?

At 4 inches thick, 1.23 cubic yards, or 1.36 with 10% waste: 62 bags of 80 lb. At 6 inches, 1.85 cubic yards, 2.04 with waste.

How is concrete measured for an odd shape?

Split it into rectangles and circles, work out each one, and add them. The square footage calculator adds the areas; multiply the total by the thickness in feet for the cubic feet.

Does the order include gravel or rebar?

No. The gravel base is ordered by the same length and width at its own depth, often 4 inches compacted. Rebar and wire mesh are counted from the slab's size and the spacing the plans call for.

Walk the job. Send the bid.

The phone measures every room. BluMatrix writes the estimate line by line, with labor and materials at current prices for the ZIP code. 3 days free.

Measure the roof. Send the bid.

The roof from the address, the estimate line by line at current prices for the ZIP code, and the client signs online. 3 days free.

Walk the loss. Send the estimate.

The phone measures every room. BluMatrix writes the estimate line by line at current prices for the ZIP code, with the ESX file for Xactimate. 3 days free.

Scope it on the visit.

Every room measured on the phone, the estimate written line by line at current prices for the ZIP code, and an ESX file that opens in Xactimate. 3 days free.

Know what the job should cost.

Scan the rooms with your phone. BluMatrix writes the estimate line by line, with labor and materials at current prices for the ZIP code. 3 days free.